Since February 2, 2026, FDA investigators can review supplier audit reports that the former Quality System regulation kept out of routine inspection. The supplier requirements, which now come from ISO 13485:2016, are largely unchanged. Early QMSR inspections cited outsourcing and purchasing second only to risk management, so the quality of supplier records now matters as much as their existence.
The Quality Management System Regulation (QMSR) replaced the Quality System (QS) regulation and incorporates ISO 13485:2016 by reference. FDA describes the two sets of requirements as substantially similar. For supplier programs, three things changed: audit reports became reviewable, inspections follow a new compliance program, and early citations point to suppliers.
Under 21 CFR 820.10(a), a manufacturer must document a quality management system that complies with ISO 13485. The former 21 CFR 820.180(c) kept management reviews, quality audit reports and supplier audit reports out of routine FDA inspection. FDA’s QMSR FAQ states that this exception is not maintained in the QMSR and that the agency has authority to inspect these records.
FDA stopped using the Quality System Inspection Technique (QSIT) on February 2, 2026. Investigators now inspect under Compliance Program 7382.850, Inspection of Medical Device Manufacturers, which groups requirements into six QMS areas. One of them is Outsourcing and Purchasing. For several inspection types, including for-cause and compliance follow-up inspections, investigators evaluate at least one element in each area, chosen by risk to patients and users. Baseline inspections cover a fixed set of elements.
FDA officials reported at the MedCon conference that across about 100 QMSR inspections from February 2 through March 31, 2026, the most Form 483 observations were in risk management, followed by outsourcing and purchasing (RAPS Regulatory Focus, April 28, 2026). FDA has not published the underlying counts.
Supplier controls under the QMSR come from ISO 13485:2016. The standard requires risk-based evaluation, selection, monitoring and re-evaluation of suppliers; written agreements on change notification where applicable; verification of purchased product in proportion to risk; and quality agreements for outsourced processes. In summary:
Clause 7.4.1, purchasing process: documented procedures and criteria for evaluating and selecting suppliers, based on their ability to provide conforming product, their performance and the effect of the purchased product on device quality, proportionate to risk. The manufacturer plans monitoring and re-evaluation, addresses unmet purchasing requirements in proportion to risk, and keeps records of results and resulting actions.
Clause 7.4.2, purchasing information: where applicable, a written agreement that the supplier will notify the manufacturer of changes to the purchased product before implementing them.
Clause 7.4.3, verification of purchased product: the extent of verification is based on supplier evaluation results and proportionate to risk.
Clause 4.1.5, outsourced processes: the manufacturer keeps responsibility for outsourced processes, applies controls proportionate to risk and to the supplier’s ability, and documents those controls in written quality agreements.
“Approved supplier list” and “SCAR” (supplier corrective action request) are industry terms. The standard does not require those names; it requires the outcomes they record.
Most supplier program gaps come from applying one level of control to every supplier and from work that was planned but not done. Common gaps include:
One level of control for every supplier, so a contract sterilizer and a supplier of corrugated shipping cartons receive the same review..
Re-evaluations planned but not performed, leaving the approved supplier list out of date.
Audit reports written as notes for the auditor, without scope, criteria, objective evidence or conclusions.
Supplier corrective actions closed when the supplier responds, without verifying that the fix worked.
Quality agreements with no change-notification requirement.
Critical outsourced processes, such as sterilization, contract manufacturing and software development, purchased as if they were catalog items.
In smaller companies, these gaps usually come from capacity. Supplier work is continuous, it grows with the number of suppliers, and it competes with CAPA, complaints and design work for the same few people.
An inspection-ready program sets each supplier’s controls by risk, keeps re-evaluations on schedule, and holds records that explain themselves without the auditor present. Check your program against this list:
Written criteria tie supplier evaluation to the risk of the purchased product (7.4.1).
Every supplier has a risk classification, and the classification sets its controls: audit, monitoring and incoming inspection (7.4.1, 7.4.3).
A re-evaluation schedule exists and is current (7.4.1).
Supplier audit reports state scope, criteria, evidence, findings and conclusions, and can be read without the auditor present.
Supplier nonconformities are tracked to closure, with effectiveness verified (7.4.1, 8.5.2).
Quality agreements exist for outsourced processes and include change notification (4.1.5, 7.4.2).
The approved supplier list in your eQMS matches what purchasing actually buys.
Supplier records can be retrieved quickly during an inspection.
Companies close these gaps in three ways: hiring a supplier quality engineer, using a part-time contractor, or engaging a firm to run the program on an ongoing basis. Whichever route you choose, clause 4.1.5 still applies. If you outsource supplier management, treat the provider as a supplier under clause 7.4, define responsibilities in a quality agreement, and keep approval authority with your own quality management.
When comparing options, ask:
Review your supplier files the way an investigator would. Select your three highest-risk suppliers and confirm that the evaluation, audit reports, monitoring data and corrective actions tell a complete story without explanation. Correct the gaps in order of supplier risk, starting with outsourced processes.
Kapstone Medical’s supplier management service can run this review and maintain your supplier program on an ongoing basis. It is part of our quality assurance services.
Not by that name. ISO 13485 clause 7.4.1 requires records of supplier evaluation, selection, monitoring and re-evaluation. Most companies keep those records as an approved supplier list in their eQMS.
Yes. FDA’s QMSR FAQ states that the former 21 CFR 820.180(c) exception is not maintained and that FDA has authority to inspect management review, quality audit and supplier audit reports.
ISO 13485 does not set a frequency. Clause 7.4.1 requires planned monitoring and re-evaluation. Set the interval by supplier risk and performance, and keep to the schedule your procedure sets.
You are. Clause 4.1.5 keeps responsibility for outsourced processes with the manufacturer. Treat the provider as a supplier, define responsibilities in a quality agreement, and keep approval authority with your own quality management.